Skip to content
G&G Controls, The Panel People

Sewers for Adoption

Adoptable pumping station control panels for UK water authorities

Kiosk-mounted panels built to Sewers for Adoption and each authority's own amendments, ready for handover.

3 to 5 weeks with kioskSewers for AdoptionDesign and Construction GuidanceBS EN 61439-2

Three authorities

United Utilities, Anglian Water and Severn Trent specifications on file. Others on request.

Kiosk supplied

Single or double door GRP kiosk, fitted and wired.

Handover documentation

Drawings, test certificate, DoC and O&M information.

Shorter lead times

Standardised builds mean weeks, not months.

An adoptable pumping station panel has to satisfy the water company that will own it, not just the developer who pays for it. We build to Sewers for Adoption, the Design and Construction Guidance that replaced it, and the specific amendments and deletions of United Utilities, Anglian Water and Severn Trent, and we supply the documentation the authority's engineer will ask for at handover.

What the authorities ask for

Each water company publishes its own variations: kiosk type and colour, telemetry outstation, hours run and ammeters, generator inlet, ultrasonic level control, specific labelling and drawing conventions. We keep these specifications on file and build to the current version. If you send us the adoption agreement or the authority's technical requirements we will confirm compliance before we quote.

What we supply

  • Kiosk-mounted control panel to the authority's specification, GRP kiosk supplied and fitted.
  • Telemetry outstation wiring and volt-free signals to the authority's schedule.
  • Level control by ultrasonic or radar head with float backup, as required.
  • Generator inlet, heater, light and socket.
  • Wiring diagrams, test certificate, declaration of conformity and O&M information for the handover pack.

Sector lead: John Davey

John has more than 20 years in the industry and leads our adoptable work, checking each panel against the relevant specification and advising clients on what the authority will and will not accept.

Specification

ComplianceSewers for Adoption 7th/8th edition and Design and Construction Guidance; authority amendments and deletions
AuthoritiesUnited Utilities, Anglian Water, Severn Trent; others on request
PumpsTypically 2, DOL or star/delta
Level controlUltrasonic or radar with float backup, or floats
TelemetryOutstation wiring and volt-free signals per authority schedule
EnclosureGRP kiosk, single or double door, with panel inside
DocumentationWiring diagrams, test certificate, declaration of conformity, O&M
Built toBS EN 61439-2, BS EN 60204-1, BS 7671

Every panel ships with its wiring diagram, a test certificate and a 12-month warranty.

Price and lead time

Priced per project against the authority's specification. Send the adoption requirements and pump details for a quotation.

Typically 3 to 5 weeks including kiosk, depending on the authority's requirements.

Frequently asked questions

Jobs we have done with this range

All case studies →

Request a quote for Adoptable panels

Tell us the pumps or points, the supply, the site and anything the panel must comply with. Attach a spec or drawing if you have one.

“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”

Pump installer, on the Basix range
  • Wiring diagram, test certificate and 12-month warranty with every panel
  • Built to BS EN 61439-2 and BS EN 60204-1 in Stoke-on-Trent
  • We reply during working hours, usually the same working day

Request a quote

Or call 01782 280577

What happens next. Adoptable enquiries go to John Davey, our adoptable sector lead. We reply during working hours, Monday to Friday, 7am to 5pm.

Your details go to our sales team by email and are used only to answer this enquiry. No mailing list, nothing shared. Privacy policy.

Got a project, or just need a quick answer?

Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.