Water and wastewater · Pump service contractor
An old mill's de-watering station refurbished, with alerts added
A de-watering station under an old mill, reached through a brick culvert, was cleaned out and refurbished from the pumps up. Two new pumps, new floats and a Telemetrix panel mean the next problem is a message rather than a flooded basement.
- Customer
- Pump service contractor
- Site
- Old mill de-watering station
- Panel
- Telemetrix
- Also fitted
- Two pumps and new floats
The challenge
Bring a neglected de-watering station back into service, and keep it that way.
What we supplied
A Telemetrix panel running two new pumps and float switches, after a full clean-down of the station.
The result
Back in service and reporting its own faults rather than waiting to be found.
The requirement
Bring a neglected de-watering station back into service and keep it that way: clear out what had built up, replace the pumps and level control, and give the operator warning when something goes wrong, at a site nobody visits often.
The constraints
- An old mill: a confined brick culvert with awkward access for plant and people.
- Years of silt and debris to clear before anything new could go in.
- De-watering, so a failure means water where it should not be, and nobody on site to see it.
What we built
The contractor carried out a full clean-down with their Capcombi unit and installed two new pumps and float switches, with a Telemetrix panel to run them. Pump trip, high level and panel offline alerts go out by email and text over 4G or the site network.
Delivery
Supplied from the Telemetrix range for the refurbishment.
The outcome
A working station with remote monitoring where there was none. In the words of the irrigation technician who did the work: "A satisfying refurbishment on an old mill's de-watering station completed. We carried out a full clean-down using our Capcombi and installed two new pumps, floats, and a Telemetrix alert panel for remote monitoring."
Got a similar job?
Send the spec, points list or drawing and we will tell you what we would build, the price and the date.
“The detail, and thought that goes into making these installer and end user friendly is second to none. The best control panels we've seen, let alone had the pleasure of using. Great products.”
- Wiring diagram, test certificate and 12-month warranty with every panel
- Built to BS EN 61439-2 and BS EN 60204-1 in Stoke-on-Trent
- We reply during working hours, usually the same working day
More case studies

Butlins Skegness
One motor control centre for 64 motors in a water park plant room
The pool and water park plant room at Butlins Skegness needed a new motor control centre to run every pump, blower and feature from one place, with a BMS interface for the integrator's controllers. We designed and built it in Stoke-on-Trent.
Read the case study
Confidential London project
Every BMS control panel for a prestigious London building, from one supplier
The full BMS control panel supply package for a high-profile London building: every outstation and motor control panel across its plant rooms, designed, built and tested in Stoke-on-Trent and delivered to the contractor's programme. The client and project cannot be named.
Read the case study
SSE Energy Solutions
A Form 2 outdoor BMS panel on the roof in 12 working days
SSE Energy Solutions were refitting the third floor of Highgate Mental Health Hospital in London: new walls, heating, HVAC, electrical and controls throughout, with a new BMS tying into the trust's existing Trend network. The panel for it had to sit on the roof, and the only crane was coming down in three weeks.
Read the case studyGot a project, or just need a quick answer?
Tell us what the panel has to do and we will come back with a price and a lead time. Existing accounts: reorders and spares go through the same form.