Sitemap
Main
Panels
Sectors
- Sectors
- Water and wastewater
- Building services and BMS
- OEM and equipment manufacturers
- Adoptable and water authorities
- Case studies
- One motor control centre for 64 motors in a water park plant room
- Every BMS control panel for a prestigious London building, from one supplier
- A Form 2 outdoor BMS panel on the roof in 12 working days
- Three Telemetrix panels for West Sussex County Council's landfill pumping stations
- A star/delta Telemetrix panel, turned round quickly for an Oxford campus
- Telemetrix as standard across a pump service contractor's stations
- A care home pumping station rebuilt from the pipework up, with Telemetrix on top
- End-of-life panel replaced at a school, floats included, in one visit
- An old mill's de-watering station refurbished, with alerts added
- Out with the old, in with the new: a station upgraded to Telemetrix
Technical
Articles
- Do control panel enclosures need to be metal? The law.
- Analogue vs. Digital Signals
- Why did a 72 million litre flood happen in a non-floodplain?
- Why are multiple earths on the same stud banned?
- Leading voices in pump control, with Atlantic Pumps
- Functional Safety Training - Should you do it?
- Why single phase motors need capacitors
- The pros and cons of building your own panels
- Wago lever terminals – a new era for control panels
- Inverters no longer break the bank!
- Controlling Water, why go custom?
- What you are doing wrong with overloads
- Data centre cooling for Vera Rubin, Nvidia's new CPU and GPU platform
- Float switches vs ultrasonics: choosing the right level control
- Why sewage pits need ATEX rated equipment
- Basix View: a simpler approach to level sensing
- Replacing control panel components
- Common control panel mistakes
- Why do stepping relays fail on pump control panels?
- What Isolators actually do (and installers don't know!)
- Remote Motor Monitoring - Where is the industry?
- How to wire the control terminals on an Invertek Optidrive Eco (ODV-3)
- The end of earth blocks in panels
- Why wastewater pumps should be deliberately over-sized
- Motor starting methods: DOL, star/delta, soft start and inverter
- Capacitor Sizes
- Choosing level sensing: radar vs hydrostatic vs float switches
- Webinar: introducing Telemetrix, remote monitoring built into the panel
- Mild steel vs polyester glazed enclosures: what’s the difference?
- Electrical symbols: electronic filters
- Should you gland both ends of SWA cable?
- Wiring diagrams: eating spaghetti for breakfast
- Telemetrix - remote pump monitoring
- Relays - the things you always wondered
- G&G Controls Live: the Ask the Experts session
- The dangers of emergency stops, and why they don't always do what you think
- Transformers: A Quick Guide
- How to run a 3 phase motor on a single phase supply
- Troubleshooting a dual pump panel fault
- Best switchgear enclosure options in the UK
- Do you need surge protection in your panel? Here's what you need to know.
- Cutting BMS panel build times by 50%
- Why do single phase pumps block more often than three phase pumps?
- Interview with Direct Pumps & Tanks
- Star/Delta motor starting - why is it so misunderstood?
- Building Management Systems (BMS): what are they and how do they work
- What's the full load current of the motor?
- Replacing failed inverters
- Form 4 or Form 2 enclosures, what does it mean?
- How to specify a pump control panel: the six things we need to quote it
- Wiring a Basix pump control panel on site: supply, pumps and floats
- Duty/standby, duty/assist and duty changeover explained
- Where to hang the floats: stop, start, assist and high level
- The high level alarm has gone off: what to do
- Adoptable pumping station control panels: what the water companies require
- Why does my pump keep tripping? A diagnostic checklist
- Kiosk or wall-mounted? Choosing an enclosure for an outdoor pump station
- BS EN 61439-2 for panel buyers: what the certificate covers, and what it doesn't
- IP ratings explained: IP55, IP65 and IP66 for control panels
- What a control panel test certificate should include, and what to ask for
- UKCA and CE marking on control panels: where things stand
- Telemetry costs explained: SIM, data, texts and the Dashboard
- How to write a BMS points list that gets an accurate quote
- What's inside a BMS outstation panel
- Free-issue controllers: how it works and what we need from you
- Standardising a control panel platform: how OEMs take cost and lead time out
